Site Location: Port St Lucie, FL
Client: Phillips & Jordan

Overview

Florida Silt Fencing installed over 24,500 LF of silt fence, protecting 37 inlets at the C 23/24 Reservoir in Port St. Lucie. In addition to the silt fence and inlet protection measures, our crews also installed 24 sections of floating turbidity barriers to prevent debris and sediment from entering the water

Challenges

The water depth varied from location to location around the job site, so we needed to install different lengths of floating turbidity barriers in the correct spots.

Solutions

With help from Phillips & Jordan personnel, our crews were able to follow the plans and place the correctly sized sections in the proper locations. Overall, we completed the project accurately and efficiently.

Notable Stats

  • 37 Inlets with Silt Fence
  • 24,521 LF Silt Fence
  • 24 sections of Floating Turbidity Barrier